Production Dashboard
Saved Products
0
Active catalogue models
Materials Configured
0
Plywood, MDF & Hardware
Laser Machines
0
CO₂ profiles calibrated
Latest Unit Cost
RM 0.00
No projects yet
Recent BOM Costing Projects
| Product / Model | SKU | Batch Qty | Unit Cost | Selling Price | Margin | Last Modified | Actions |
|---|
DOCTORKAYU WOODCRAFT & LASER PRODUCTION
Manufacturing Bill of Materials & Cost Quotation Report
1. Product Specifications
Unsaved Draft
Total units manufactured in this run
2. Bill of Materials (BOM Components)
| Component Name | Library Material | Unit | Qty / Unit | Batch Qty | Unit Cost (RM) | Total Cost (RM) |
|---|
Direct Materials Subtotal:
RM 0.00
3. Plywood Sheet Estimation & Wastage
Sheet Size
-
Est. Parts Per Sheet
0 pcs
Sheets For Batch
0
Wastage Factor
%
* Note: Rectangular grid estimate. Irregular nesting curves in LightBurn or LaserCAD can yield higher packing efficiency.
4. CO₂ Laser Cutting & Engraving Costing
From CAD / LightBurn contour outline
Estimated Laser Run Time Per Batch:
0 mins
Laser Processing Subtotal:
RM 0.00
5. Post-Processing Labour, Finishing & Overheads
%
Rent, consumables, dust filtration
Live Cost Breakdown
10 units
Raw & Sheet Materials
RM 0.00
RM 0.00 / u
Material Wastage Allowance
RM 0.00
RM 0.00 / u
CO₂ Laser Processing
RM 0.00
RM 0.00 / u
Direct Sanding & Assembly
RM 0.00
RM 0.00 / u
Finishing & Packaging
RM 0.00
RM 0.00 / u
Shop Overhead Allocation
RM 0.00
RM 0.00 / u
Selling Price (Unit):
RM 0.00
Gross Profit (Unit):
RM 0.00
Gross Margin: 0.0%
Product BOM Library
| Product Name | SKU | Category | Batch Qty | Unit Cost | Selling Price | Margin | Last Saved | Actions |
|---|
Raw Material & Hardware Inventory Library
| Material Code | Material Name | Type | Dimensions / Unit | Price | Cost / m² | Supplier | Actions |
|---|
Configured CO₂ Laser Machine Profiles
| Machine Name | Tube Power | Hourly Rate | Default Cut Speed | Default Engrave Speed | Allowances (Power/Depr) | Actions |
|---|
Default Shop Labour Rates & Costing Guidelines
These default presets populate newly created BOM projects automatically to standardize production quotes across the Doctorkayu workshop.
%
%
Local Data Storage & JSON Backups
Notice: Doctorkayu BOM Calculator operates in local browser storage mode. Data is stored directly on your computer. To prevent accidental data loss when clearing cookies or switching computers, make regular JSON backups below.